Office Buildings

LignoAlp Office Building

Brixen/Bressanone, Italy

Exterior View 1 | Exterior View
A new office building for a wood construction company doubles as a showcase project for the technological, energetic, and design possibilities of wood.
Design: A South Tyrolean wood construction company required an additional office building for its administration which would also serve as a showcase for their technical expertise and the company philosophy. The new building is the result of an invited competition and stands out significantly in the industrial zone where it is situated. It was built by the company itself.

Wood: The wooden monolith with five overground floors is set on a black concrete basement. The facade with its undulating larch fins is a playful representation of wood as a light and heavy material. The building was designed to feature a variety of approaches to build with wood, from raw industrial grade cross-laminated timber to refined face quality grade timber for the interior finishing. Solid cross-laminated timber beams and frames form the structural system of the building, while the non-loadbearing walls are made with a lighter timber frame and panel construction.

Energy: The thorough use of solid cross-laminated timber and modern house technique allowed for a certification as a passive house (CasaClima Gold). Additionally, the building was awarded with the certificates CasaClima Nature for its exclusive use of sustainable construction materials as well as CasaClima Work&Life for its pleasant indoors working environment qualities.
Interior View 2 | Interior View
Detail: Staircase 3 | Detail: Staircase
Detail: Design 4 | Detail: Design
31m
Basic information
Year of Completion |  2012
Investor |  Damiani Holz&KO SpA, Brixen/Bressanone (IT)
Architecture |  MoDus Architects, Brixen/Bressanone (IT)
Structural Engineering |  Wood: Othmar Waldboth, Klausen-Latzfons/Chiusa-Lazfons (IT); Damiani Holz&KO SpA, Brixen/Bressanone (IT)
Construction Time |  24 months
Number of floors |  4 + basement
Gross floor area |  2 140 m² (655 m² from level 1 up)
Construction Costs (netto) |  2 500 €/m²
Awards |  KlimaHaus Work&Life

Technical aspects
Concept |  Variety of construction systems: Wood frame construction for outer and inner walls; cross-laminated timber for the core; cross-laminated, edge-glued, fin, and plank timber ceilings.
Woodworking |  Damiani Holz&KO SpA, Brixen/Bressanone (IT)
Origin of Timber, Certification |  PEFC-certified wood from Southern Germany (DE), Austria (AT)
Traceability of Timber |  Guaranteed through certification
Forestry Value Chain |  Exclusively local companies involved
Energy Efficiency Standard |  CasaClima Gold (<10 kWh/m²a)
Energy Systems |  Heating and air cooling through bio mass, heat recovery through mechanical ventilation
Energy Consumption  |  8 kWh/m²a (heating energy demand)
U-Value Wall | Roof | Floor | Windows (W/(m²K)) |  0,27


Regional Wood Cost Saving Energy Efficiency


Site Plan Site Plan Basement Floor / Ground Floor / Second Floor Basement Floor / Ground Floor / Second Floor Cross Section Cross Section



Civil Engineering Works

  • 09Hyère River Road Bridge
  • 17Stuttgart Wood Bridge
  • 27Avisio River Footbridge
  • 44Forest Observation House
  • 52Elephant House Zoo Zurich

Multistorey Buildings

  • 02HoHo Wien
  • 10Building Cooperative Habrico
  • 28Social Housing Via Cenni
  • 45Karantanika Apartments

Residential Buildings

  • 03Stürcherwald House 
  • 11Chalet Chantemerle
  • 29Jesolo Lido Pool Villa
  • 46Scandinavian House

Commercial Use

  • 04Ski Hut Wolf
  • 12Sheep Stable
  • 30Oberholz Mountain Hut
  • 47Youth Hostel Punkl

Office Buildings

  • 01Illwerke Zentrum Montafon
  • 05Wälder Insurance
  • 13Administrative Offices
  • 31LignoAlp Office Building

Refurbishment and Restoration

  • 06Working quarters Josef Weiss
  • 22Freiburger Hof
  • 32Passeggiata dei Castani
  • 49Upgrading of Hotel Terme
  • 50Alpine Barn Apartment

Public Buildings

  • 07Civic Center
  • 08Fire Station Thal
  • 15Passive House School
  • 33Community Center Caltron
  • 51EXPANO Pavilion
  • 57Théâtre Vidy Pavilion

Special Projects

  • 06aLoft in the Barn
  • 34Sasso Nero Mountain Hut
  • 35Veidlerhof
  • 36Tree of Life
  • 48Wooden Interventions